Titanic 4D Simulator [Unlocked]

Titanic 4D Simulator [Unlocked]

Version: 1.3.16

Realistically recreated ship locations
Titanic 4D Simulator VIR-TOUR on Android is detailed and incredibly realistic simulator, which will allow you to go on a virtual tour of the legendary liner - Titanic. You will find realistically recreated rooms of the ship, the opportunity to independently walk along the decks of the largest passenger ship of the early 20th century, explore all possible rooms and more. You can also feel like the captain of a ship and control the Titanic, fly around the entire ship and appreciate its scale, visit the guest and technical rooms of the ship.

Titanic wreck mode and night mode
You can download Titanic 4D Simulator VIR-TOUR for free on Android and take a walk on the largest passenger steamship, which tragically sank after colliding with an iceberg. You will visit cabins and decks, service rooms and masts, storage rooms and technical rooms. The Titanic itself has been recreated with incredible realism, with attention to every last detail, so you can feel the authentic atmosphere of the ship. The game features several interesting game modes, thanks to which you can control the Titanic, walk around it, use night mode, or tu on the Titanic wreck mode and see in detail how it went under water after colliding with an iceberg.

Version
5.23
Android OS
24
Updated
30 Nov -0001
First release
16 Apr 2024
Disk space
0 Байт
Rating
3.7
Screenshot
Screenshot
Screenshot
Screenshot
Screenshot

How to update Titanic 4D Simulator [Unlocked]

  1. Download the new version of the app
  2. Install it over the old one (do not uninstall the previous version)
  3. Important: The update will only work if the previous version was downloaded from our website. If the app was installed from another source, the new version will cause a signature conflict, and you will see the error "App not installed".

Attention

Due to the modified signature and modifications, the native security may detect the app as malicious.